ItemNo :
LITH-ZWRD200MOQ :
1Color :
optionalPort :
Xiamen PortCompliance:
CEWarranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comSingle Side 5000A/8000A Automatic Rotary Head Spot Welding Machine With Host Computer Program
Features
Spot welding machine has stable performance, can be used in various battery types and multiple battery pack processing, convenient and fast fixture replacement, beautiful appearance, all aluminum alloy body.
Advantages
1. Touch screen display, more convenient operation and clearer display.
2. Three file programming modes, manual input, array, CAD drawing import, simple and fast response to various complex program editing.
3. The welding head has the function of air cooling or water cooling, which can effectively reduce the impact of spot welding needle temperature on welding quality. 4. It can store up to 99 groups of files, which is easy to use and does not need complicated process of line changing and machine adjusting.
5.The spot welding program of A side and B side of fixture can be switched.
Specification
Product |
Single Side Automatic Spot Welding Machine |
Number of storable filegroups |
99 |
Model |
LITH-ZWRD200 |
Operate System |
Embedded system + man machine interface |
Y-axis Travel |
500mm (can be customized) |
X-axis Travel |
400mm (can be customized) |
Driving mode |
Stepper motor / servo motor |
Repeated Positioning Accuracy |
±0.02mm |
Max Welding Speed |
0.35s/spot, 2800pcs/h |
Power |
2000W |
Max Motor Speed |
1000mm/s |
Weight |
200kg |
Max Battery Number |
X:26 Y:26 |
Maximum bearing weight of Y-axis |
50kg |
Rotation Function of Welding Head |
The welding head supports positive and negative rotation, and is suitable for spot welding of special-shaped batteries and anti-sticking needle function. |
Welding Material |
Pure nickel strip: 0.03-0.2mm
Nickel-plated steel strip :0.03-0.3mm
|
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity