2.Battery Production Line Basic Information Requirement:
a. Cell specification
b. Daily productivity requirement
c. Working shifts and working hours
d. Project timeline
e. Battery application
3.Four Key Aspects for a Successful Partnership:
*Flexible large scale equipment
to produce cutting edge cell tech. on a large scale and provide flexibility to integrate innovations.
*Turnkey or Cluster Solutions
covering all process steps for battery production and integration within cluster solution
*Interest in a Long-term Partnership
to help customers further extend the factory in the midterm to cater to bigger capacity battery production line
*Commitment to Ambitious Timeline
According to the customer's project schedule, make corresponding planning and be punctual
4.Machine Introduction:
4.1 Automatic feeding system
The feeding system mainly solves the problem that the positive and negative materials are automatically fed into the homogenizer according to the process ratio, solving the unfavorable factors such as high labor intensity of manual feeding, inaccurate feeding, and external pollution of the slurry, and mainly reducing the production cost of the battery cell;
4.2 Introduction of mixing system
The stirring system disperses and stirs all kinds of cell materials evenly;
Main parameters of the equipment: 1. Vacuum degree and vacuum retention rate; 2. Equipment stirring, dispersion speed, dispersion linear speed; 3. Material and hardness requirements of stirring paddle; 4. Stirring and dispersion time 5. Temperature control during stirring process, etc.;
4.3 Introduction to the production and winding process
cleaning, pole piece edge correction, automatic winding, automatic terminating glue sticking, blanking and other functions.
4.4 Introduction to X-RAY inspection process
whether the negative pole wraps the positive pole to ensure the safety of the battery core.
4.5 Introduction of vacuum baking process
The purpose of standing at room temperature is to fully infiltrate the winding core inside the cell.
4.7 Introduction to coating and coding process
the film.
5. Cylindrical Battery Production Line Process:
6. Cylindrical Battery Production Line Reference Layout:
7. Battery Equipment Display:
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity