ItemNo :
LITH-RBMOQ :
1Place of Origin:
ChinaWarranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comLab Doublle Rolls Crushing Machine for Ores and High Hardness Materials
Description
Lab Double-roll Crusher is mainly applied to crushing all kinds of materials, which are less than compressive strength limit of 2000kgs per square centimeter, such as ore, limestone, coal gangue, slag, carbon block in the industry of refractory material, chemical, coal, building material and so on.
Working Principle
The roller is made of wear-resistant alloys in high strength, machine utilizes strength caused by rollers’ counter rotating to crush materials. After materials are put into tank, materials are crushed into fine particles by strength of rotating tooth force of both rollers and then fine particles are output from tank. Gap between rollers can be adjusted randomly in a range of 0mm-20mm, and granularity of particles can be controlled according to requirement.
Features
1.Long service life , not easy to damage.
2.Compact structure,light weight and small size.
3.Simple structure, small footprint , easy to operation and maintenance
4. Reasonable structure , low running cost , smooth operation , energy-efficient ,high crushing efficiency.
5.Dust board installed inside , good sealing performance, avoid splashing of crushed fine material.
6.The particle size is adjustable, after tune of the roll gap, the broken particle size can be reliably controlled accordingly, and all the granularity will be discharge in the ideal size.
Parameter
Feed Material |
Roll Size |
Rotation Speed (rpm) |
End size (mm) |
Power (kw) |
Capacity(kg/h) |
Motor Power (kw) |
Dimension (mm) |
Stainless steel |
Φ200*125mm |
52 |
3 |
380 |
300 |
1.5 |
680*500*840 |
Corundum |
Φ200*240 |
52 |
3 |
380 |
300 |
1.5 |
680*500*890 |
Nylon |
Φ200*2000 |
52 |
3 |
380 |
300 |
1.5 |
680*520*840 |
Product Images
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.