Products
Home Products Sodium Ion Cell Production Line

Sodium-ion Battery Slitting Slitter Machine For Na-ion Cell Electrode Cutting

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Sodium-ion Battery Slitting Slitter Machine For Na-ion Cell Electrode Cutting

Sodium-ion Battery Slitting Slitter Machine For Na-ion Cell Electrode Cutting

  • Product Details

Sodium-ion Battery Slitting Slitter Machine For Na-ion Cell Electrode Cutting

1.Product brief introduction:

The machine used for electrode roll slitting after press, it adopts no clearance knife for slitting, slice edge neat, ensure dimensional accuracy.


2.Main feature:

*Adjustable guide device for feed positioning;

*Using electric rolling cutting strip;

*The meshing amount can be adjusted;

*Upper and lower blades with the same speed, synchronous transmission;

*Plexiglas protection device is arranged at the hob for safe operation;

*Open hob fixed mode, easy to disassemble the hob;

3.Technical parameter:

The machine is consist of up and down cutter, holder,  Inlet and outlet positioning plate, gear,  reducer, motor.etc.

*Cutter knife type:Up and down round knife

*Width:10~300mm

*Standard cutter:56mm,56mm,56mm,58mm,58mm.58mm.(can be customized)

*Suitable thickness:50-400μm battery electrode

*Up and Down gap:Handwheel adjusted 0.2-0.4mm

*Cutter diameter:85mm

*Cutter material:Ultra-fine grained alloy steel

*Slitting speed:<2m/min,adjustable

*Voltage:AC220V/50Hz (AC110V/60HZ)

*Power:0.5KW

*Dimension:L 90×W 105×H 30(cm)

*Weight:about 60KG;









PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.