ItemNo :
LITH-TMHMOQ :
1Warranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comSodium Ion Battery Dr. Blade Film Applicator Coater Machine With Optional Hot And Vacuum Function
LITH-TMH is a CE Certified ready compact tape casting coater with a heating cover designed to produce films with consistent thickness. It has a unique driving system to produce a smooth coating on all types of materials. The flat vacuum chuck is built in to hold the substrate sheet in place, which is particularly useful when making thin coatings. There is a 100 mm width adjustable micrometer applicator (doctor-blade).
Heating cover with digital temperature controller can dry films after coating up to 100°C with a temperature accuracy of +/-1°C. This equipment can be used for researchers on ceramic tape castings and Li-Ion battery electrode coating.
Specifications
Model |
TMH250 |
TMH300 |
TMH350 |
TMH550 |
TMH800 |
TMHXXX |
Effective Coating Size |
100*250mm |
200*300mm |
250*350mm |
250*550mm |
250*800mm |
customized |
Machine Weight |
80kg |
100kg |
115kg |
130kg |
160kg |
N/A |
Accessories: Film Applicator |
Optional 50 up to 300 mm width micrometer film applicator is included Or customized |
|||||
Optional Heating Cover Voltage and Power |
110VAC or 220VAC |
|||||
Traverse Speed |
0 - 120 mm/sec variable Accuracy: 10mm/sec |
|||||
Vacuum Pump |
Vacuum pump is included |
|||||
Heating Cover |
1. Pre-installed on the top cover 2. Built in digital temperature controller with accuracy of +/-1°C 3. Suspension support helps open cover easily and safely 4. Max. Heating Temp: 200°C |
|||||
Compliance |
CE Certificate |
|||||
Warranty |
Two years limited warranty with lifetime support |
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.