ItemNo :
LITH-CPJ-500MOQ :
1Compliance:
Warranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comSodium-ion Battery Cross Cutter Machine For Na-ion Cell Electrode Production
I. Overview:
This machine is suitable for precise cutting of the fixed length and tracking of the coated cathode and anode rolls of secondary lithium-ion batteries (applicable for cutting after continuous or intermittent coating), resulting in neatly trimmed edges without burrs or powder detachment. It is an important piece of equipment in the production process of the lithium-ion battery industry.
II. Working Principle:
The machine unrolls the material using a tension controller and the stepping motor drives precision feed rollers to achieve fixed-length feeding. An imported high-accuracy color mark sensor ensures tracking and control for positioning and intermittent cutting, with the cylinder executing the cut.
This machine adopts an industry-original four-post guide and innovative tool design, effectively ensuring the cutting accuracy, stability, and service life. It is equipped with well-known brand components and PLC control, with a color touch screen for operation, providing a user-friendly interface and ease of use, and high control precision of cutting. It can set processing batches, quantity, and automatic stoppage upon completion of processing.
III. Specification
Maximum Power |
1.5KW |
Maximum Cutting Width |
500mm |
Fixed Length Accuracy |
±0.3mm (up to ±0.1mm) |
Cutting Length |
1mm to 10M |
Positioning Accuracy |
±0.3mm |
Cutting Speed |
0 to 4000 cuts/hour |
Machine Weight |
Approximately 380Kg |
Dimensions |
L1000 × W1100 × H1000 (mm) |
Casing Material |
Galvanized steel plate with surface powder coating |
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.