ItemNo :
LITH-YDS0405MOQ :
1Port :
Xiamen PortCompliance:
CE CertifiedWarranty:
1 Year limited warranty with lifetime supportDelivery Time:
Email :
Louis@lithmachine.comLab Automatic or Manual Electric Heating Vacuum Laminating Equipment
Product parameter
Equipment type |
YDS0405 |
Lamination area |
400X500mm |
Overall dimension |
700x800x1100mm(height) |
Equipment weight |
0.3T(main engine)+0.2T(vacuum system) or 38KG |
Power source |
380V3 Phase 4 line |
Bee value power consumption |
4KW |
Vacuum pump speed |
8L/S |
Operating power consumption |
1.5KW |
Control mode |
Automatic/manual; Free switching |
Limiting vacuum |
20PA |
Heating method |
Electric heating |
Temperature control mode |
PID control |
Maximum temperature |
180 ℃ |
Temperature uniformity |
±3℃ |
Vacuum vent during power failure |
In the case of power failure, the manual lamination can continue, and the air release handle can be moved to complete the air release |
Equipped with gas circuit outage protection |
In the case of sudden power failure, the air circuit system is automatically sealed to prevent the cylinder from falling down the upper cover |
Emergency cover opening system |
In the event of an emergency power failure and other abnormal conditions, you can manually open the upper cover and take out the component |
Set the emergency button |
Emergency situations can be dealt with quickly and forced to cut off the power supply of the whole machine |
Keep the upper cover safe in case of misoperation |
Set the emergency button switch, press it when there is an accident, the laminating organ will cut off the main power supply, and the upper cover will remain in place |
Insufficient vacuum alarm |
When the vacuum degree of the lower chamber fails to meet the set requirements, the system will alarm |
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.