ItemNo :
MSK-FT02MOQ :
1Delivery Time:
5 daysEmail :
Louis@lithmachine.com
Features
MSK-FT02 is a CE Certified magnetic de-ironing filtration system. It is designed for optimizing the condition of slurry before the coating process. The slurry will pass through a set of strong permanent magnetic rods and then a mesh filter to remove large particles and iron impurity. Such a system is not only able to filter out the large particles but also remove iron to improve the quality and stability of the electrode slurry.
Specifications
Structure |
Containers Made of Stainless Steel 304 |
Voltage supply |
Input:110VAC - 240VAC universal power |
Power |
50W |
Working Temperature |
<=40°C |
Process Capacity |
5L |
Magnetic Field Strength |
8000 G |
Filter |
3 mesh filters: 80, 100, 120 |
Slurry Viscidity |
<=15000CP |
Humidity |
0-90%RH |
Deironing Function |
8000-10000 GC |
Overall Dimensions |
|
Shipping Weight & Dimension |
130 lbs, 48"x40"x43" |
Compliance |
CE Certified CE, TUV, UL, CSA certified in power supply Machine is safe 24VDC input , which can be used without any safety certification |
|
One year limited with lifetime support Parts rusted without regular cleaning and maintenance are not covered by the warranty |
STANDARD PACKAGE
Item No. |
Product Name |
QTY |
MSK-FT02 |
Magnetic De-ironing Filtration System (5L) for Battery Electrode Slurry |
1 |
FT02-Tank |
Receiving tank for Battery Electrode Slurry |
1 |
FT02-Container |
Slurry Container |
1 |
FT02-FILTER |
80,100,120 Filter mesh (3 pcs) |
1 SET |
UL adaptor |
UL certified adaptor |
1 |
Hex wrench |
4mm Hex wrench |
1 |
Screw-bolt |
Screw-bolt for taking out Magnetic rods |
1 |
For the coin cell Assembly, we also recommend you the following items:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.