Products
Home Products Battery Large Production Line Pouch Cell Machine

Lithium ion Battery Making Machine Solvent Processing System Waste Gas Treatment Equipment For Pouch Cell

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Lithium ion Battery Making Machine Solvent Processing System Waste Gas Treatment Equipment For Pouch Cell

Lithium ion Battery Making Machine Solvent Processing System Waste Gas Treatment Equipment For Pouch Cell

  • ItemNo :

    LITH-NMP-2
  • MOQ :

    1
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details


Lithium ion Battery Making Machine Solvent Processing System Waste Gas Treatment Equipment For Pouch Cell


 Technical Parameter
  It is mainly used to filter and treat the internal solvent of waste gas produced in the drying process of coating machine to realize the function of dust removal and exhaust gas purification.

Model

LITH-NMP-2

Work mode

Continuous work

Processing capacity

600 m3 / h

Inlet temperature

≤ 150 ℃

Recovery rate

≥ 80%

Recycled object

Water-soluble solvent gas

Processing gas

Gas

Scope of treatment

Water-soluble solvent

Contact material

SUS304 stainless steel

Gas emissions

External piping

Access volume

600m / 3 / h

Temperature

0-40 ℃

Vibration and shock

There are no visible sources of vibration around

Explosion protection

Explosion-proof treatment

Three-phase

380 VX 50Hz

Power

1.5kW





Waste Gas Treatment Equipment

pouch cell production line









PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.