Products
Home Products Battery Large Production Line Pouch Cell Machine

Automatic Vertical Plate Gap Coating Machine for Battery Production

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Automatic Vertical Plate Gap Coating Machine for Battery Production

Automatic Vertical Plate Gap Coating Machine for Battery Production

  • ItemNo :

    LITH-Vertical-Plate3
  • MOQ :

    1
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

Automatic Vertical Plate Gap Coating Machine for Battery Production



Gap Coating Machine

No.

Project

Technical Parameters

1

Process adaptability

Lithium battery pole piece coating

2

Coating method

Continuous coating / gap coating

3

Rewinding volume configuration

Single-axis/two-axis manual roll change, automatic roll change

4

Heating method

Electric heating / steam heating / oil heating

5

Oven configuration

Active over roller + suspension oven, length optional

6

Mechanical speed

Coating speed +10%

7

Coating speed

1~15m/min (depending on the model)

8

Coating width

500mm,600mm,650mm

9

Coating thickness

50um

10

Thickness accuracy

±0.5μm (when the coating thickness is greater than 1um)


Advantage:


1. Steel roller, rubber roller, scraper installation structure is simple, easy to maintain and maintain

2. Control system is easy to operate, the touch screen interface is simple and easy to understand

3. Having a thickness head and tail thickness adjustment, automatic knife gap adjustment closed loop tension control system applied length-measuring function (optional), and negative face of homogeneous systems, the oven temperature protection system, online defect inspection system (optional)





Gap Coating Machine

pouch cell production line








PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.