Products
Home Products Battery Pack Equipment Li ion Battery Tester

Laboratory Burning Tester Flame Resistance Test Machine For Lithium Battery Safety Testing

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Laboratory Burning Tester Flame Resistance Test Machine For Lithium Battery Safety Testing

Laboratory Burning Tester Flame Resistance Test Machine For Lithium Battery Safety Testing

  • ItemNo :

    LITH-RSSY
  • MOQ :

    1
  • Place of Origin:

    China
  • Color :

    optional
  • Port :

    Xiamen Port
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

Laboratory Burning Tester Flame Resistance Test Machine For Lithium Battery Safety Testing



Introduction

This machine is suitable for battery flame resistance test and is manufactured according to UL2054 and other test standards.

 

Specification

Burner

Bunsen burner, the inner diameter of the tube mouth is 9.5mm and the length is about 100 mm

Flame application time

0~ 999.9 seconds ± 0.1 seconds

Test hole surface diameter

102mm

Test cover width

24 "(610mm), octagonal

Test cover height

12 "(305mm)

Accessories

Including burner and support frame, test table, standard metal mesh cover, standard metal mesh

Equipment power supply

1φ220V, 50/60HZ, 10A

Other

Automatic ignition, automatic control of the test process.

 

If you customize more than six machines, you can integrate the machines into a comprehensive console




 










PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.