ItemNo :
LITH-ZTH-02MOQ :
1Delivery Time:
5 daysEmail :
Louis@lithmachine.com
High Speed Die Cutting Machine With Gap Coating For Pouch Cell Production
Features
1.Dual Unwinding Mechanism with Quick Roll Change, One for Operation and One for Backup.7.Top-mounted FFU Fan for Air Supply, Industrial Dust Extraction System with Negative Pressure at Multiple Workstations such as Die Cutting and Material Receiving, Promoting Internal Air Circulation and Removing Airborne Particles.
Specification
Project |
Parameter |
Production efficiency |
>180PPM |
Burr size |
Vas12um ; Vbs12um |
Deviation correction accuracy |
≤±0.1mm |
Slice forming accuracy |
±0.2mm |
Mold Life |
1. After each mold repair, it can be used no less than 1.5 million times; 2. The number of times the mold can be repaired ≥ 10 times; |
Material box receiving accuracy |
±0.5mm |
Qualification rate |
≥ 99.8% (defects caused solely by the machine) |
Crop growth rate |
≥ 98% (faults caused solely by the machine) |
Overall dimensions |
W1750mm x L7000mm x H2350mm |
Weight/bearing capacity |
About 3000kg; >650Kg/M-2 |
Power |
AC380V three-phase; Voltage fluctuation ± 10%; Power: 30KW; Frequency: 50Hz |
Compressed air |
0.5-0.7Mpa (5-7kgf/cm2), dosage 400L/min |
Project |
Parameter |
|
Punching method |
Metal mold punching |
|
Material system |
Continuous coating of electrode sheet coil material after slitting, with one side outlet lug |
|
Roll diameter |
≤ 600mm |
|
Inner diameter of drum |
3"/6" |
|
Pole winding error |
士3mm |
|
Snake shaped bending error of polar plate |
±1mm/m |
|
Height difference of polar wave edge |
<2mm |
|
Pole width W |
60~200mm |
|
Pole length L |
80~300mm |
|
Pole ear length H |
10~30mm |
|
Pole ear edge distance Q |
5-20mm |
|
Pole ear width P |
10~50mm |
|
Pole ear belt material X |
0~2mm |
|
Round RB |
2~5mm |
|
Round corners RA |
Inner rounded corner |
Outer rounded corner |
Production Assembly Plant
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.