Products
Home Products Battery Lab Machine Line Coin Cell Lab Machine

Electrolytic Thin Copper Foil Sheet and Roll Used for Li Ion Battery Anode

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Electrolytic Thin Copper Foil Sheet and Roll Used for Li Ion Battery Anode

Electrolytic Thin Copper Foil Sheet and Roll Used for Li Ion Battery Anode

  • Product Details

Electrolytic Thin Copper Foil Sheet and Roll Used for Li Ion Battery Anode 


SPECIFICATION:

Improve the consistency of battery usage group and reduce battery cost significantly.

Improve the adhesion of active material and the collector, and reduce the electrode manufacturing cost.

Reduce the polarization, increase the rate and capacity, improve the battery performance.

Protection of fluid collection, extend battery life.

Possess Japan Fuji coating machine, slitting machine and automatic computer inspection rewinder machine.

Average coating speed reach 90-120m/min.

    Product 21600m conductive coating aluminum foil every 8 hours,can be used for    200Kpcs 18650 core.

Roller coating width up to 1 meters.

Can adopt continuous or intermittent coating mode. 

Inspection item

Parameters

Unit

Original thickness (Al foil)

15

um

Double side coating thickness

3

um

Aluminum foil width

309.6

mm

Coating width

280

mm

Single side Average surface density

0.42

g/m2

Tensile strength

214.3

Mpa

Extensibility

1.583

 

Remarks

If there are special requirements, can be customized












Coin Cell Process:

Materilas → Powder Processing  →Powder Grinding Mill → Vacuum Mixing  → Electrode Coating → Roll Press  → Vacuum Drying  → Disc Cutter → Electrolyte Injection  → Crimping Machine  → Battery Analyzer 



For the coin cell Assembly, we also recommend you the following items:








PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.