Products
Home Products Ball Mill Roll Ball Mill

30L Lab Light Horizontal Roller grinder Jar Mill

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
30L Lab Light Horizontal Roller grinder Jar Mill 30L Lab Light Horizontal Roller grinder Jar Mill 30L Lab Light Horizontal Roller grinder Jar Mill 30L Lab Light Horizontal Roller grinder Jar Mill 30L Lab Light Horizontal Roller grinder Jar Mill 30L Lab Light Horizontal Roller grinder Jar Mill

30L Lab Light Horizontal Roller grinder Jar Mill

  • ItemNo :

    LITH-RBM-30
  • MOQ :

    1
  • Warranty:

    Two years limited warranty with lifetime technical
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

30L Lab Light Horizontal Roller grinder Jar Mill


1.Model:RBM-30

2.Ball mill tank volume:30L(ML)

3. Ball milling tank material: stainless steel lined with 20mm thick zirconia brick

4. The maximum material loading: material and grinding medium in each tank should not exceed two-thirds of the volume

5.Feeding size: crispy materials less than 10mm, others less than 3mm

6.Discharge size: 50-1000 mesh (according to material characteristics)

7.Rotating Speed: 60r/min(±2)

8.Speed regulation mode: frequency conversion speed regulation (with timing accumulator

9.The distance from the discharge port to the ground: 370(MM)

10. Feeding port size: the feed port size is 180*140mm (specifically subject to the confirmed design drawing)

11.Discharge method: manual positioning loading and unloading

12.Working voltage: single-phase 220V, 50HZ

13.Host motor power 1.5KW (motor brand is Dedong)

14. Equipment reference size: 1075 (length) * 530 (width) * 1100 (height) (MM)

15. Equipment reference weight: about 150(KG)







PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity