Products
Home Products Battery Lab Machine Line Cylindrical Cell Lab Machine

NMP Solvent Processing System Dual-Filtration System for NMP(N-Methyl-2-pyrrolidone) Vapor of Li-ion Battery coating

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
NMP Solvent Processing System Dual-Filtration System for NMP(N-Methyl-2-pyrrolidone) Vapor of Li-ion Battery coating

NMP Solvent Processing System Dual-Filtration System for NMP(N-Methyl-2-pyrrolidone) Vapor of Li-ion Battery coating

  • ItemNo :

    LITH-NMP-1
  • MOQ :

    1
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

NMP Solvent Processing System Dual-Filtration System for NMP(N-Methyl-2-pyrrolidone) Vapor of Li-ion Battery coating

 


Features

LITH-NMP-1 is a CE Certified Dual-Filtration System for NMP(N-Methyl-2-pyrrolidone) Vapor of Li-ion Battery coating. It can be used to filter the vapor formed from the process of coating and drying with the dual-filtration level in Li-ion battery R&D. Water-filter design provides dedusting, NMP filtering, and vapor purification methods.


Specifications

Structure

SS 304


Features

 

Dual-filtration level 

NMP filtering 

Working Voltage

Three-phase AC380V 50Hz

Power

1.5 KW

Working Temperature

0-40℃

Filling Gas Temperature

<=150℃

Capacity

600mm³/h

Recycle Rate

>=80%

Recycle Object

Vapor

Inlet Flow Rate

600mm³/h

Product Dimensions

900mm L x 700mm W x 1500mm H

Compliance

CE Certified


Warranty

 

1. One year limited warranty with lifetime support 

2. Rusting and damage due to improper storage condition or maintenance is not covered by warranty 

Net Weight

500 kg





pouch cell production line









PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.