ItemNo :
LITH-PCH600MOQ :
1Warranty:
2yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.com
Lab Hydraulic Press Double Plate Heating Mold With Temperature Controller Up To 300C
Double plate electric heating die is an electric heating die composed of two heating plates. The sample is placed between the two heating plates and heated directly by the temperature controller. The high temperature of the mould can reach 300 ℃, and the thickness of the pressed film is 50um-500um. It is suitable for the study of polymer materials and other film materials, and can be used as a small flat vulcanizer. It is suitable for rubber, plastic, leather, chemical industry, pigment, electronic appliances, textile, hardware and other fields. It is a complete set of equipment for engineering and technical personnel of colleges and universities and research institutes to carry out spectrum detection and qualitative analysis.
Standard condiguration
Electric heating mold(customizable) 1 set
High temperature insulation board 1 set
Temperature controller 1 set
optional
Hydraulic hot press machine
Water cooler→It is recommended to configure water cooler if rapid cooling is required after mold heating.
Technical Parameter
Shape of compressible sample |
Shape self-assessment: two square plates are heated, and the sample is placed in the middle of the two plates for heating or pressurizing |
Thermostat type |
PLC program temperature controller, room temperature - 600.0℃, accuracy 0.1℃ |
Mold heating temperature |
Room temperature - 300℃ |
Mold heating size |
100×100mm or 180×180mm |
Die material |
Alloy tool steel: Cr12MoV |
Die head hardness |
HRC60-HRC62 |
Mold Dimensions |
100×100×120mm or 180×180×130mm |
Mold weight |
8kg or 32kg |
Standard configuration |
2 sets of flat heating mould + 1 set of high temperature heat shield + 2 sets of intelligent temperature controller (hydraulic press and water cooler are optional) |
Product Images
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.