ItemNo :
LITH-VIFMOQ :
1Port :
XiamenCompliance:
CEWarranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comLab 1-5 KG Vacuum Melting Furnace with Molecular Pump
Technical parameters
ZLF Vacuum Induction Melting-VIM
|
Model |
VIF-1 |
||
Maximum melting weight (calculated by iron liquid) |
500G |
|||
Maximum heating temperature |
2200 ℃ |
|||
Floating power supply |
oscillation frequency |
15-30KHZ |
||
Max Input/ Output Power |
60KW/ 54KW |
|||
PSU |
Suspended special power supply |
|||
Cooling water requirement |
PSU≥0.2MPa crucible≥≥0.35MPa |
|||
melting rate |
10-15min |
|||
induction coil |
Special coil for suspension furnace |
|||
input voltage |
3 PHASES 380V 50 HZ |
|||
crucible |
Suspended special water-cooled copper crucible |
|||
Cavity vacuum degree (molecular pump unit) |
< 5X10 -3Pa |
|||
Broken even protection and display |
Yes |
|||
over-temperature protection |
Yes |
|||
Over-current protection |
Yes |
|||
Under pressure protection (Water pressure) |
Yes |
|||
Temperature Stabilizing |
PID |
|||
Temperature detection mode |
infrared thermometer |
|||
Crucible can dump rotation Angle |
0-360° |
|||
Whether the vacuum chamber can be connected with water cold crucible |
yes |
|||
Observation window size |
Dia 90mm |
|||
Vacuum Unit |
Unit input voltage |
380V /220V |
||
Bellow |
KF40X1000 |
|||
Vacuum baffle valve |
KF40 |
|||
vacuum pump TRP24 |
Power |
0.75KW |
||
Voltage |
380V |
|||
rotate speed |
1450rpm |
|||
Inlet Diameter |
KF25/KF40 |
|||
pumping rate of the front pump(L/S) |
6 |
|||
ultimate pressure |
4X10 -2Pa |
|||
compound vacuum gauge |
Model |
ZDF |
||
PSU |
220V 55W |
|||
control precision |
± 1% |
|||
pressure range of vacuum gauge |
10-5 -10 5 Pa |
diffusion pump TK200 |
Voltage |
220V |
|
Power |
1500W |
||
Extreme vacuum (when it's not leaking) |
10E-5 | ||
Inlet interface |
DN200 |
||
Outlet interface |
DN40 |
||
Injection of oil |
0.5L |
||
pumping rate(N2) |
1500L/S |
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.