ItemNo :
LITH-PBM-H-0.4AMOQ :
1Warranty:
Two years limited warranty with lifetime technicalDelivery Time:
5 daysEmail :
Louis@lithmachine.com
Characteristics of high-energy planetary mill
The high-energy ball mill mainly adopts the principle of planetary mill. It drives the medium in the tank to collide, shear and disperse with the material through the high speed centrifugal force. The inner wall of the tank and the ball speed are different, the friction force and impact force between the material and the medium are different, and the high energy generated is different. The self rotating speed of 1630 turns generates high energy (equivalent to 60 times the gravity acceleration), and reliable and reproducible nano grinding results can be obtained in a very short time, This equipment is an ideal equipment for sample mixing and homogenization or mechanical activation and alloying with high efficiency, and is suitable for sample preparation for geology and minerals, pharmacy, mechanical alloying, chemistry, nanotechnology, metallurgy, material research, ceramics, biology, and analysis.
Parameter
Model |
PBM-H-0.4A |
Volume(L) |
0.4 |
Configurable ball mill tank specifications |
50-100ML |
NO. |
2 |
Matching vacuum ball milling tank |
50ml vacuum ball mill |
Standard ball mill tank locking device |
Self-locking |
Power(Single phase) |
Single phase 200V-50HZ |
Motor power(KW) |
0.37 |
Total operation setting time(min) |
1-9999 |
Alternate running time(min) |
1-999 |
Adjustable speed revolution(rpm) |
47-815 |
Adjustable speed rotation(rpm) |
94-1630 |
Standard panel (intelligent and touch screen optional) |
Ordinary |
Lubrication method |
Lubricating oil |
Speed regulation mode |
Frequency control |
Weight(kg) |
35 |
Overall dimension(mm) |
570*300*450 |
Noise≤db |
55±5 |
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity