ItemNo :
LITH-ShrinkingMOQ :
1Color :
OptionalPort :
Xiamen PortCompliance:
CEWarranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.com
Automatic PVC Heat Shrink Wrapping Machine Shrinkage Equipment for Cylindrical Battery Pack Assembly
Features
(1) High efficiency: the film efficiency is 50~70PCS/MIN. It is 6~10 times of artificial efficiency;
(2) High precision: the precision servo motor and high-precision mechanical structure make the film precision up to ±0.1MM, and the technology is leading the industry;
(3) Highly intelligent: the humanized operation interface is convenient for manual operation, the fault is automatically alarmed, and the fault point is clear at a glance;
(4) Simple operation and maintenance: the personnel can operate the equipment with a little training, and the maintenance is relatively simple;
(5) High flexibility of equipment: After replacing the fixture and mold, it can be adapted to cylindrical batteries such as AA, AAA and 18650.
Specifications
(Can be customized)
Model
Lith-Shrinking
Specification
AA,AAA,18650
Film speed
50~70PCS/MIN
Film precision
±0.1MM
Power supply
380V/220V
Air pressure
0.5~0.7Mpa
Power
9KW
Weight
800KG
Machine size
2100(L)*950(W)*1600(H)
Casing requirements
The width of the coil is 29.7±0.2mm, and the thickness of the single layer is 0.08±0.01mm.
Insulation sheet coil size
width between 20 ± 0.1mm (no material break and tape interface in the middle of the coil)
Insulation sheet die size
Outer diameter 17.4 ± 0.1 mm; inner diameter 10.5 ± 0.1 mm; inner and outer diameter concentricity ± 0.10 mm
Heat shrinkable bottom edge size
2.5mm ± 0.3mm (size error is related to casing material and baking conditions)
Related Machine
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity