ItemNo :
LITH-SYP24MOQ :
1Warranty:
2yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.com
24T Tabletop Manual Hydraulic Press for Material Pressing
Our Laboratory Hydraulic Pressing Machine has the advantages of small volume, high pressure and high precision of pressure control. It is applied to chemical industry, such as: scientific research, pharmaceutical, teaching, testing, catalysis and so on. In addition, this product can also be used with Fourier infrared spectrometer. Fluorescence spectrometer supporting sample preparation, can replace similar imported products.
8.The Aluminum Alloy handwheel, beautiful, practical, durable, not easy to damage.
Specification
Model
SYP-24B
SYP-24BS
SYP-24BF
SYP-24BFS
Standard package
Analog gauge
Digital gauge
Analog gauge
+Protection cover
Digital gauge+Protection cover
Pointer pressure gauge
Analog type, double scale display of pressure(Ton) and intensity of pressure(Mpa)
Digital gauge
Digital display, 0.00-40.00 MPa, accuracy 0.01 MPa
(Optional)
Pressure range
0-24T(0-34MPa)
Piston diameter
Chrome plated cylinder φ95mm
Piston stroke
30mm(T)
Pressurization mode
Manual pressurization / manual slow pressurization
Pressure stability
≤1MPA/10Min
Overall structure
Integrative structure patented technology, no sealed connection of equipment, reduce oil leakage point
Workstation diameter
φ105mm
Number of columns
4 pillars
Protection cover
Without
With plexiglass protective cover
Working space
80×150mm(W×H)
120×160mm(W×H)
over dimension
245×175×415mm(L×W×H)
305×195×425mm(L×W×H)
Weight
42kg
60kg
NOTE
The work space can be customized to increase the height
Product Images
Hydraulic Press Mold
Other Related Hydraulic Press
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.