Products
Home Products Lab Furnace Tube Furnace

Lab High Temp Horizontal And Vertical Tube Furance

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Lab High Temp Horizontal And Vertical Tube Furance Lab High Temp Horizontal And Vertical Tube Furance

Lab High Temp Horizontal And Vertical Tube Furance

  • ItemNo :

    LITH-SK2-6-12TPF4
  • MOQ :

    1
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

Lab High Temp Horizontal And Vertical Tube Furance 


The picture is just for reference


Main parameter

PN: SK2-6-12TPF4

Max.Temp: 1200C

Working temperature:0-1100C

Tube diameter:150mm

The heating zone length:400mm(single zone)

Length:1000mm(subject to design)

Power:6kw(subject to design)

Tube material:Quartz tube

Heating rate:0~20 Degree/Min

Voltage:220V,single phase 50/60HZ

Max.vacuum:-0.1Mpa

Heating element:Resistance wire

Thermocouple:K type

Temperature accuracy: ±1℃

Special design

It can be used in a horizontal and verticalconfiquration.

Inlet gas/Atmosphere

It can be filled with various protective or destructive gases,Inert gases, mixed gases, nitrogen, oxygen, etc

Gas control

each air inlet is provided with a ball valve, connected with a vacuum gauge. The air outlet is connected with vacuum pump, and all holes are equipped with ball valves.

 Furnace chamber design  

Furnace adopts the stepped assembly structure, integrating the mechanical law, effectively ensure the furnace in the heating process of uniform force, ensure that the heat is not easy to disperse, prolong the service life of the furnace.

Furnace shell  structure

Electric furnace shell adopts double layer forced air cooling structure, so that the electric furnace works at the highest temperature and the external temperature of the shell is close to room temperature, so as to avoid accidental injury.

Sealing way

Adopt 304 stainless steel flange, with easy loading and unloading, oxidation resistance, acid and alkali resistance, double seal, ensure the sealing  

Temperature control security

The electric furnace adopts integrated circuit, module control, double circuit protection (partial temperature protection, ultra-high temperature protection, coupling protection, overcurrent protection, and other protection functions) to make the electric furnace work stable and reliable, safe.

Warranty

One year limited warranty with lifetime support, excluding heating element,cooling fans,thermocouple and quartz tube damaged by user.

Attention: Any damages caused by the use of corrosive and acidic gases, and any damage from wrong operate and use are not under the coverage of One Year Limited Warranty.

Standard Package Accessories:

Electric Furnace

1 set

 

High temperature gloves

1 pair

 

Crucible hook

1 pc

 

Quartz tube

1 pcs

 

Stainless steel flange

1 set

 

Tube stopper

2pcs

 

10mm Air pipe

 

 

User manual

1 book

 

Vacuum pump

1 set

 












PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.